Case Study – Arbroath Housing Estate
An existing old roadway required leveling with dense base-course 150mm deep and was completed with hot rolled asphalt and pre-coated chips. All laid with heavy duty Vogele and Bomag Rollers.
Junction lining was carried out with white thermoplasctic lining, all done to meet local authority specification.
Find out more…
For further information on our road surfacing works and how we can assist you with your next project give us a call today on 01382 370379.